This section centralizes the configuration of behavior and operational control of Work Orders (WOs). From here, it is possible to define rules that affect the execution, validation, traceability, and consistency of the information recorded in the WOs, adapting the system to the processes of each organization.
Options and Permissions:
Allow adding attachments to completed WOs: Fracttal One is a fully auditable software, compliant with the most important quality standards. For this reason, once a WO is completed, it can no longer be canceled or edited. However, by enabling this permission, you can add attachments (notes, links, or files) to completed WOs.
Allow completing/canceling WOs with pending material requisitions: By default, Fracttal One does not allow a WO with pending material requisitions (meaning the material has not been issued from the warehouse module) to be completed or canceled, which requires the corresponding process to be carried out in the warehouse. However, by enabling this permission, you can complete or cancel a WO whose material requisition has not been delivered from the warehouse.
Set the asset out-of-service end date to the task completion date: By default, the out-of-service end date is the date on which the WO linked to the task is completed. By enabling this option, the out-of-service end date will be the task completion date (that is, the final date of its execution):
Allow assigned human resources to be WO owners (multi-owners): By enabling this function, any user with a technician profile (or limited technician) who is added as a human resource within a WO will be able to see the WOs in which they are participating as the service performer. Keep in mind that if this option is disabled, the user with a technician profile will only be able to see the WOs in which they are designated as the “owner.”
Allow editing the actual quantity used with pending material requisitions: By default, the actual quantity used of inventory-type resources is set according to the issue made in the warehouse. However, by enabling this option, you can edit this field (actual quantity used) within the WO:
Allow rating WOs in review: By enabling this function, you can rate a WO that is in review. When it is disabled, a WO can only be rated when it moves from the “in process” status to “review.”
Filter human resources by the selected profile (within a task): By enabling this function, when you choose a human resource profile within a task, the human resource source selector will only show the human resources that have that profile in the “regular hour rate” field.
Allow updating triggers with active WOs: This functionality allows you to modify task triggers even when the work orders are in process or in review.
Make failure catalog completion mandatory: If enabled, you must record all failure details before completing the WO. If disabled, the WO can be completed without filling in the failure catalog.
Allow automatic WO generation to be triggered by the scheduled date: With this option, the system can generate the WO using the scheduled date according to the permission enabled for each user or company. A specific permission is added that defines whether the WO should be generated with the scheduled date, and the “Generate Work Order with:” action is adjusted to respect that configuration.
Require signature on Compliance and Safety forms: When this option is enabled, the system requires users to electronically sign the forms before they can complete any action or process.
Allow advanced WO cancellation options: WO cancellations offer multiple alternatives: cancel only, cancel and automatically reschedule tasks according to the plan’s frequency, or cancel and generate a new WO with manually defined execution dates.
Record execution time as the actual quantity of the human resource: Takes the time the technician records when executing the task and automatically uses it as the actual quantity of the human resource, with no need to enter it manually.
Analyze compliance without monthly restriction: This option lets you adjust the planned task compliance chart to analyze information without the monthly limitation. This setting makes it easier to evaluate by date range, consistently taking into account planned tasks, tasks scheduled in Work Orders, and completed tasks.
Confirm actual quantity of resources used when sending to review: When you send the WO to review, the system asks you to confirm the actual quantity used of each resource before continuing.
Confirm actual quantity of resources used when completing: When you complete the WO, the system asks you to confirm the actual quantity used of each resource before finalizing the action.
Enable execution time categorization: Allows you to classify the execution time recorded in a task by category (for example, preparation, travel, or execution), instead of recording it as a single value.
Automatically generate the sharing link for all WOs: By enabling this function, you can automatically generate links to share WOs.
Restrict simultaneous time entries across multiple tasks: Restricts a human resource from working simultaneously on tasks that belong to different Work Orders. When this option is enabled, the system validates both task starts and manual time entries to prevent overlaps.
Restrict closing a child WO while the predecessor is open: Prevents completing or canceling a WO that depends on another one while the predecessor WO remains open.
Assign dependent auxiliary failure catalogs: When you create an unplanned task with a failure, the system dynamically filters the options based on your selections, showing only the causes and detection methods related to the selected failures.
Assign dependent auxiliary task catalogs: When you enable this option and select a task type, the system dynamically filters the classifications, showing only the dependent categories.
Calculate task progress using mandatory subtasks only: When you enable this option, Fracttal One calculates a task’s progress percentage considering only the mandatory subtasks. Otherwise, it includes all associated subtasks, both mandatory and optional, in the progress percentage.
Work Order ID:
Here you can customize the numbering sequence that Work Orders will have regarding prefix and suffix, along with the issuance sequence of generated work orders.
Note: Once you have made the necessary edits, you must click the save button to apply the changes made.